← Resources

By Robert McCormack · Updated July 17, 2026

How to Prepare Website Content Before a Redesign

A website redesign moves faster when the content is organized before design and development begin. This checklist helps a business decide what to keep, improve, combine, or remove while protecting the pages and systems that already matter.

A website redesign moves faster when the content is organized before design and development begin. This checklist helps a business decide what to keep, improve, combine, or remove while protecting the pages and systems that already matter.

Start with a complete content inventory

List the material that exists today before deciding what the new website needs. Include more than visible pages:

A spreadsheet is usually enough. Give each item an owner, current URL, intended action, and approval status.

Decide what happens to every useful page

For each existing URL, choose a clear next step:

Do not remove or rename an important URL without checking whether it receives search traffic, has external links, appears in printed material, or is used by a QR code. When a URL changes, record the correct redirect destination.

Clarify the audience and next action

Every page should answer three practical questions:

  1. Who is this page for?
  2. What should that person understand?
  3. What should they do next?

This keeps content decisions tied to the visitor journey instead of filling a template. A service page may lead to a consultation request, while a resource may lead to another guide or a relevant service overview.

Assign content ownership early

Name the person responsible for drafting, reviewing, and approving each page. One person may hold several roles on a small project, but the responsibilities should still be clear.

ResponsibilityPractical question
Content ownerWho confirms that the information is accurate?
Writer or editorWho turns the information into clear website copy?
ApproverWho gives final approval before launch?
Technical ownerWho verifies forms, tracking, integrations, and redirects?

Approval dates are useful because a redesign can stall when feedback arrives after layouts and development are already complete.

Prepare content for the new page structure

Organize copy around meaningful headings rather than long blocks of text. For each planned page, prepare:

Avoid linking to placeholder pages. Internal links should point to real canonical URLs, such as the website redesign service or the guide to choosing between a redesign and a rebuild.

Protect technical and operational dependencies

Content work affects more than copy. Review the systems attached to each page and record what must continue working:

Test these items in staging before launch. A page should not be considered complete simply because its text and design look finished.

Set a review and migration sequence

A practical sequence is:

  1. Inventory the current site and connected assets.
  2. Decide what to keep, improve, combine, or remove.
  3. Confirm the new sitemap and page responsibilities.
  4. Draft and review content before final page assembly.
  5. Add approved content to staging.
  6. Test links, forms, tracking, mobile layouts, and accessibility basics.
  7. Confirm redirects and retained URLs before launch.
  8. Review the live site after deployment.

Use a simple readiness checklist

Before development depends on a page, confirm that it has:

Preparing content this way reduces avoidable rework and gives the redesign a clearer foundation. If the larger project direction is still uncertain, start with Website Redesign vs. Rebuild: How to Choose before finalizing the content plan.

Discuss a website project